No double-entry. No P6 migration. Forge ingests your native Primavera P6 schedules and project documents to extract governing rules, resolve delay attribution, and compute net contractual exposure. Automatically.
Contractual Risk Intelligence for CPM-Mature Construction Projects • Non-Invasive .XER & Document Overlay
“Client delayed approval of foundation rebar drawings by 12 calendar days.”
Owner redesign overlapped with contractor delivery slippage. Net contractor exposure neutralized.
Clause 8.7 LD exposure triggered by potential Milestone 2 slippage.
FIDIC 20.1 initial notice window for geotechnical obstruction.
Delays are concurrent, penalties are contractual, and evidence lives in thousands of unstructured documents.
Standard tools sum all delays into gross exposure. But when the Owner and Contractor overlap, only one party is truly liable. Getting this wrong destroys margin.
Liquidated damages, milestone penalties, and weather entitlements are buried in contracts — disconnected from the CPM schedule causing the exposure.
Without a deterministic link between a delay event, its responsible party, and the contract rule it triggers, you have no commercial argument.
No workflow disruption. No double-entry for site teams. Forge acts as an overlay intelligence layer on top of your existing files.
Drop native Primavera P6 (.XER / .XML) schedules and project PDFs (meeting minutes, daily logs, change orders). Forge vectors and correlates all unstructured text without altering your schedule baseline.
The engine extracts delay signals, checks DCMA 14-point schedule health, attributes party responsibility, and executes concurrent delay netting per the SCL Protocol.
Generate courtroom-admissible SCL hearing dossiers, boardroom executive briefing PDFs, and statutory time-bar notice letters before contractual condition-precedents expire.

From raw documents to net contractual exposure. Deterministically.
Ingest P6 schedules and project documents. Extract Signals (events) and Constraints (governing rules like LDs, milestone penalties, notice windows).
Link each signal to the responsible party (Owner, Contractor) and project its causal delay interval onto the influenced CPM activity.
Propagate delay intervals upstream. Multi-path analysis computes 'Risk Pressure' and 'Ghost Bars' — visualizing latent schedule fragility before it hits the critical path.
Apply urgency heuristics to surface 'Act Now' signals. Group drivers by contractual severity and potential financial exposure.

Forge doesn't just read documents. It evaluates rules, interprets causality, resolves conflicts, and computes financial consequences.
Most tools sum every delay to get gross exposure. Forge uses a concurrent sweep algorithm to neutralize overlapping owner and contractor delays — showing the penalty that is truly chargeable.
The executive dashboard separates Contractual Penalties (LDs) from Operational Burn. Executives see the sword hanging over the project, not just the internal accounting.
Contract rules (Liquidated Damages, milestone penalties, weather entitlements) are extracted from documents and stored as typed constraints. Penalties apply only when the constraint is actually triggered.
Every signal is attributed to its responsible party — Contractor, Owner, Third Party, or Force Majeure — by the LLM using contextual language. The confidence of each attribution is tracked.
Forge adds a high-definition "Ghost Bar" layer over your P6 schedule. It visualizes exactly where risk is forming — even if the current Critical Path hasn't shifted yet.
Not all signals are equal. Forge categorizes every risk into "Act Now", "Monitor", or "Watch" tiers based on float proximity, contractual LD rates, and attribution confidence.
Prospective Time Impact Analysis (SCL Protocol Principle 4). Inject sub-network fragnet delay activities into your contemporaneous CPM baseline in memory, quantify net Liquidated Damages exposure in Euros (€), and auto-draft contractual delay notices.
Dynamically compile live project intelligence into a pixel-perfect, boardroom-ready A4 PDF. Headless rendering ensures your executive briefings are always mathematically sound and immaculately formatted.
Collaborate with Owners and Subcontractors on a single schedule truth. Clean-Room field-level firewalls automatically redact contractor profit margins, labor multipliers, and privileged legal counsel advice.
Turnkey corporate domain discovery and native federation with Okta, Microsoft Entra ID, and PingFederate. Automated SCIM 2.0 user lifecycle sync with soft de-provisioning that preserves forensic audit integrity.
Generate courtroom-admissible dispute bundles compiled strictly per the Society of Construction Law (SCL) Delay and Disruption Protocol, complete with cryptographic SHA-256 integrity stamps and Expert Statements of Truth.
Never forfeit legitimate delay claims to condition-precedent traps. Live countdown tickers enforce strict notice deadlines across FIDIC (28-day notice), NEC4 (8-week notice), AIA A201 (21-day notice), and JCT contracts.
Enforce schedule logic hygiene before delay claims arise. Forge automatically audits your P6 baselines against DCMA 14-point standards — flagging missing logic ties, negative float, excessive lag, and invalid relationship constraints.
Deploy across active projects without changing a single site tool or training teams on complex software. Simply drop native Primavera P6 (.XER / .XML) schedules and daily PDF logs directly into the engine.

See how Forge helps project managers prevent budget overruns and defend against commercial claims.
Owner redesigns foundations. Contractor steel delivery also slips. Both impact the critical path.
Sweep algorithm detects overlap. Nets down contractor exposure by 4 concurrent days.
Penalty exposure reduced from €75k gross to €30k net. Defensible at arbitration.
LD clause buried in contract addendum: €15k/day after Milestone 2.
Constraint extracted, typed as MILESTONE_PENALTY, linked to the schedule milestone
Dashboard shows penalty exposure the moment Milestone 2 slippage is detected
Subcontractor claims conditions were owner-caused. Meeting minutes say otherwise.
Signal attributed CONTRACTOR with 0.92 confidence. Evidence trail locked with timestamp.
Claim rejected. Immutable causal record prevents commercial argument.
Owner, GC, and MEP Subcontractor collaborating in the same environment on live schedule delays.
Clean-Room RBAC shares verified progress while auto-redacting GC profit margins and legal notes.
Transparent multi-stakeholder trust with zero risk of commercial or legal leakage.
Run your active schedule and documents through the Forge engine to map hidden drift and financial exposure.
Or equivalent mature scheduling software with rigorous logic.
Active Liquidated Damages or severe dispute risk.
Complex site logs, copious meeting minutes, unstructured reporting.
Typically €30M+ total project value ensuring sufficient data gravity.