Forge replaces opinion with evidence. Explore how project managers and commercial directors use Forge to calculate exposure and lock down claims.
Site meeting minutes record a 4-day structural steel delay.
Forge ingests the PDF minutes, extracting the delay signal via NLP.
The signal is semantically mapped to CPM Activity A-1040 (Steel Erection).
Engine calculates 0d float remaining, triggering a critical path shift and €45,000 projected LD exposure.
PM immediately reallocates concrete crew to run parallel operations, compressing the path back.
Chronological record of the minutes and the exact baseline configuration that proved exposure.
A subcontractor files a claim for 12 days of 'unforeseen weather delays'.
Forge searches the vector database of daily logs extending back 6 months.
Finds 14 exact daily logs from the sub’s foreman citing 'adequate weather' on the contested dates.
Contradicts the core premise of the claim structurally.
Commercial team formally rejects the claim with irrefutable embedded evidence.
A comprehensive chronological Export package containing the 14 opposing daily logs.
MEP contractor repeatedly pushes ductwork installation dates.
Forge identifies a pattern of 6 distinct delay signals across 3 weeks of daily reports.
Maps the systemic failure to the specific vendor ID and correlating logic ties.
Reveals that the MEP contractor is the origin node for 80% of downstream float erosion.
Directors use the deterministic data to enforce a commercial recovery plan.
A Vendor Scorecard summarizing their exact impact on the project's financial drift.