Claims Defense & Dispute Admissibility
Forge transforms raw site signals and meeting minutes into courtroom-grade legal evidence. Every delay attribution is compiled strictly per the Society of Construction Law (SCL) Delay and Disruption Protocol, complete with cryptographic SHA-256 integrity stamps and Expert Statements of Truth.
Core Pillars of the Claims Defense Engine
SCL Delay & Disruption Protocol Standards
Full alignment with the SCL Protocol (2nd Edition). Forge performs rigorous concurrent delay netting using an automated sweep-line algorithm, distinguishing critical path employer delays from concurrent contractor delays.
Cryptographic Evidence Sealing (SHA-256)
Every hearing bundle is signed with a high-entropy SHA-256 checksum calculated across all linked observations, CPM activity baselines, daily triage records, and quantum calculations. Any tampering after generation invalidates the hash.
Statutory Notice Clocks & Time-Bars
Automated countdown tickers monitor contractual time-bar notice requirements across FIDIC (Sub-Clause 20.1 28-day notice), NEC4 (Clause 61.3 8-week notice), AIA A201 (21-day notice), and JCT to permanently prevent condition-precedent forfeitures.
Clean-Room Stakeholder Distribution
When generating hearing bundles for external parties (Owners, Employers, Subcontractors, Arbitrators), Forge's Clean-Room firewall automatically redacts internal GC profit margins, daily prolongation rate multipliers, and confidential legal counsel notes.
Anatomy of an SCL Protocol Hearing Bundle
With a single click in /dashboard/defense, Forge compiles an admissible, multi-chapter hearing dossier ready for adjudication, DAB, or High Court litigation:
Formal declaration of facts signed under the SCL Protocol Statement of Truth standard, complete with dispute bundle ID, environment timestamp, and cryptographic hash stamp.
Chronological evidence chain extracting exact quotes from daily site logs, RFIs, meeting minutes, and architectural directives with full author attribution and confidence scores.
Baseline vs. updated CPM driving path comparisons, float erosion metrics, total delay days, and net concurrency deductions.
Granular cost breakdown multiplying compensable delay days by daily burn rates and equipment idling charges. In Clean-Room external mode, sensitive internal multipliers are sanitized.
Commercial Outcomes
Never forfeit millions in legitimate delay compensation due to a missed 28-day notice clause.
Cut claims preparation time from 6 months of forensic auditing to 30 seconds of automated evidence collation.
Share verified delay facts with external Employers and Subcontractors without ever leaking profit margins or litigation strategies.