Running DCMA 14-Point Schedule Audits
How to verify logic density, detect negative float, remove lead/lag distortions, and certify schedule integrity.
Upload or Select a Schedule Baseline
Import a Primavera P6 XML schedule via the dashboard. Forge immediately checks the file for structural integrity and cycle loops.
Navigate to Schedule Quality Assessment
In Schedule view (/dashboard/schedule), click on the Health Audit tab. Forge automatically evaluates the 14 standard Defense Contract Management Agency (DCMA) metrics:
Interpret Health Grades and Scores
Forge assigns an aggregate schedule score from 0 to 100 alongside a letter grade (A through F):
Remediate Identified Schedule Anomalies
Click on any failing metric to view the specific Activity IDs responsible (e.g., tasks with dangling logic or negative float). Resolve the issues in your P6 source file and re-import to lock a clean baseline.
© 2026 Forge Project Intelligence. All rights reserved.