The Schedule Screen
Four integrated views, four purposes. The Gantt shows schedule geometry and baseline slip. The Deviation View ranks where your baseline is eroding. The Recovery Studio crashes schedules with commercial acceleration ROI. The What-If Sandbox models prospective fragnet delay impacts before they materialize.
Gantt Chart
Schedule Import & Baselines
Click Import Schedule in the top action bar to upload an updated Primavera P6 schedule (.xml or .xer). Forge immediately validates network topology, checks for cyclic logic loops, and synchronizes the CPM activity network. Use Capture Baseline to snapshot current schedule physics for continuous variance comparison.
Float spectrum bar colours
Every bar is coloured by float remaining — not just a binary critical/non-critical flag:
The full legend is shown at the top right of the Gantt header.
Baseline bar overlay & slip tracks
When a baseline is selected, a permanent reference bar appears at the bottom edge of each activity row at the planned baseline position. If an activity is delayed past its baseline finish date, a dashed red slip track connects the planned finish to the forecast finish date, accompanied by a +Xxd variance badge at the tip.
Risk Pressure (Ghost Bars)
Enable the Risk Pressure toggle to visualize potential delay from pending signals as a ghost bar extending from the forecast bar. Color encodes urgency tier:
If these risks materialize, the forecast bar will shift to meet the ghost bar's end. WBS nodes also aggregate potential drift, showing +Nd pot. alongside confirmed slippage.
Milestone Differentiation
Milestone activities — those with identical start and end dates — are distinguished with a diamond shape in the timeline and a ◇ icon in the sidebar label. Diamond bars feature an inner shadow for a premium look.
The Gantt legend (top-right of the chart header) includes a Milestone entry for reference.
Signal badge
When signals have been detected against an activity (but haven't yet added up to visible schedule slip), a minimal ⚡+Nd badge appears at the end of the bar. Hover the bar to see the full breakdown in the tooltip.
Rich tooltip
Hovering any bar opens an instant (no delay) structured card showing:
- Activity name with risk-tinted header
- Forecast Start / Finish dates
- Baseline Finish date (when baseline selected)
- Float / Drift / Signal delay — three colour-coded metric tiles
- Progress bar (backed by
percentComplete)
Deviation View
The Deviation View is a ranked prioritisation surface. The engine computes a composite deviation score for every activity and sorts by it automatically.
Composite Deviation Score
The Deviation column ranks activities by a composite heuristic blending four factors:
Activities scoring above 120 show CRITICAL, above 70 show HIGH, above 40 show MED.
Urgency Tiers (Act Now / Monitor / Watch)
Every risk driver is automatically categorized by its Urgency Tier, determined by its proximity to contractual milestones and its current attribution status:
Financial Exposure column
The Exposure column shows the locked financial exposure from accepted signals linked to each activity. Colour is relative to the current page — not fixed thresholds:
Impact Drivers expand row
Click any row to expand the Impact Drivers panel inline. It shows every accepted and pendingsignal that contributes to that activity's deviation:
Sorting & Filtering
Every column header is sortable. The default sort is Deviation Score (highest first)— the engine's best guess at what needs attention now.
Sorting is performed server-side across the full dataset — not just the current page. This ensures ranking by Potential Exposure or Risk Pressure score accurately reflects the worst activities across all pages.
Use the filter chips (Critical / At Risk / On Track) or the AI search bar to narrow to a subset.
What-If TIA & Fragnet Sandbox
The What-If Sandbox performs prospective Time Impact Analysis (TIA) aligned with SCL Delay and Disruption Protocol (2nd Edition, Principle 4). It allows project planners, commercial managers, and directors to model hypothetical sub-network ("fragnet") disruption events in memory against the contemporaneous CPM schedule—without corrupting active baselines or polluting formal dispute records.
Fragnet Builder & Industry Scenario Presets
The left panel provides a structured scenario builder with one-click industry templates:
Users can also define custom fragnets: specify title, SCL event category (e.g. EMPLOYER_RISK, CONTRACTOR_RISK, FORCE_MAJEURE), contemporaneous narrative, duration, and tie predecessor/successor activities using searchable comboboxes with instant activity filtering.
Executive Impact HUD
Upon running a simulation, the top HUD immediately computes four key contract metrics:
Financial exposure automatically computes based on your project's contractual daily Liquidated Damages (LD) rate in Euros (€).
Dual-Layer Gantt Overlay
The Gantt Overlay tab shows the contemporaneous baseline side-by-side with the simulated post-impact schedule. Injected fragnet activities are rendered in distinctive indigo/purple, critical paths in high-visibility crimson, and slipped forecast bars are visually offset against their contemporaneous baseline positions.
Delay Impact Ledger
The Delay Impact Ledger tab provides a granular audit table of every downstream activity pushed by the injected disruption. Filter by:
- All Pushed: Full downstream impact inventory.
- Critical Path Only: Activities driving net completion slip or with zero/negative float.
- Milestones Only: Contractual completion and handover milestones impacted.
Automated Contractual Notice Drafting
The Contractual Notice tab auto-generates a formal statutory Notice of Delay citing standard conditions of contract:
Click "Copy Notice" to immediately transfer the fully formatted notice into clipboard memory for project correspondence or email to the Engineer / Employer.
Ephemeral Scratchpad Design
Autonomous Recovery Studio
When active site delays threaten contractual completion dates, the Recovery Studio algorithmically optimizes schedule compression. It models real-world trade physics, labor constraints, and diminishing return curves to recommend the most cost-effective recovery actions against contractual Liquidated Damages.
Target Active Site Delays
Unlike prospective sandbox simulations, the Recovery Studio directly links to verified contemporaneous delays. Clicking ⚡ Target Active Site Delays (+Xd) or launching from an activity forensic card immediately targets the exact number of days slipped.
4 Commercial Acceleration Strategies
The optimizer evaluates four distinct trade crashing levers:
Physical Site Compression Physics
Activities respect realistic physical limits. Schedules cannot be compressed indefinitely—overcrowding trades creates labor stacking inefficiency. If a target exceeds what the critical path can physically absorb, the engine surfaces an explicit physical compression limit boundary, preventing unfeasible superintendent plans.
Commercial Strategy Matrix & ROI
Every generated scenario reports:
- Days Recovered: Exact reduction in critical path completion date.
- Acceleration Cost (€): Premium labor, craneage, and modular fabrication expense.
- Mitigated Exposure (€): Liquidated damages avoided.
- Cost per Day Saved (€/day): Efficiency metric compared directly to contractual LD rate.
Executive Forensic Investigation Dossiers
Clicking any activity, milestone, or risk driver opens a centered, high-density Forensic Investigation Dossier designed for project directors, claims consultants, and dispute arbiters.
Activity Forensic Dossier
Displays complete CPM schedule physics alongside contemporaneous site causation:
- Planned vs. Forecast Chronology: Baseline vs actual start/finish dates with exact slip deltas.
- Float Consumption: Baseline float vs remaining vs consumed float metrics.
- Delay Attribution Bar: Visual concurrency breakdown showing Contractor, Owner, Third Party, Force Majeure, and Concurrent days.
- Contemporaneous Signals: Linked site logs with document links and direct ⚡ Plan Recovery shortcut.
- CPM Physics: Driving predecessors, successors, and commercial capital profile.
Milestone Forensic Dossier
Differentiates terminal completion anchors from intermediate sectional milestones subject to liquidated damages:
- CPM Diagnostics: Confirmed sectional variance vs qualitative risk drift modeled.
- Accrued LD Liability: Quantified contractual liquidated damages exposure.
- Schedule Drivers & Predecessors: Ranked driving predecessor activities with clean rounded pressure contributions (+XX% pressure) and one-click source signal tracing.
Risk Driver Forensic Dossier
Provides evidentiary traceability from field observation to schedule impact:
- Extraction Basis: AI reasoning narrative, timestamp, and source asset document link.
- Inference Review Gate: Human-in-the-loop approval mechanism gating whether qualitative ranges count toward project exposure.
- Validation Terminal: Interactive form allowing commercial managers to lock verified delay and cost figures with contractual rationale.
- Statutory Defense Routing: Direct trigger routing into FIDIC/NEC notice letter generators and AI claim rebuttals.